File:Wilmette Temple Interior, Jan 24, 1950.jpg
Wilmette_Temple_Interior,_Jan_24,_1950.jpg (861 × 684 pixels, file size: 332 KB, MIME type: image/jpeg)
File info[edit]
Caption | The recirculating heating system in the Temple proper has been completed and is in operation. All direct radiation from the Temple floor up is also in operation, and fans, filters, coils, etc. for the main ventilating system are being installed. Form work is completed for spiral stairs to first gallery and will be poured in February. A sub-contract has been made for entrance doors and frames which will be bronze finish. Conduit, outlet box, etc. installation is practically completed and wiring is proceeding. |
Source | Bahá’í News. Issue 229, page 2. View as PDF |
File license[edit]
![]() |
From the Bahá’í Publications, by permission of the copyright owner, National Spiritual Assembly of the Bahá’ís of the United States © 1910-2021. |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 08:08, 20 July 2019 | ![]() | 861 × 684 (332 KB) | Jagar (talk | contribs) | From BN 229 p 2 Caption: "The recirculating heating system in the Temple proper has been completed and is in operation. All direct radiation from the Temple floor up is also in operation, and fans, filters, coils, etc. for the main ventilating system... |
You cannot overwrite this file.
File usage
There are no pages that use this file.