File:Seat of the Universal House of Justice southwestern construction view.png
Original file (2,180 × 1,113 pixels, file size: 4.22 MB, MIME type: image/png)
File info
[edit]| Caption | In a photograph taken February 1 from the southwestern corner of the Seat of the Universal House of Justice, workmen are placing the steel reinforcements for the poured concrete floor at the fifth level. The groups of columns in the center of the photo are parts of two of the piers that will support the dome. The extension at ground level on the right will house blowers for the building's heating and air-conditioning systems. Earth fill is being placed between the basement levels and the excavation into the side of Mt. Carmel. |
| Source | Bahá’í News. Issue 566, page 0. View as PDF |
File license
[edit]| From the Bahá’í Publications, by permission of the copyright owner, National Spiritual Assembly of the Bahá’ís of the United States © 1910-2021. |
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 14:17, 10 July 2026 | 2,180 × 1,113 (4.22 MB) | Sarah (talk | contribs) | == File info == {{cs | caption = In a photograph taken February 1 from the southwestern corner of the Seat of the Universal House of Justice, workmen are placing the steel reinforcements for the poured concrete floor at the fifth level. The groups of columns in the center of the photo are parts of two of the piers that will support the dome. The extension at ground level on the right will house blowers for the building's heating and air-conditioning systems. Earth fill is being placed between... |
You cannot overwrite this file.
File usage
There are no pages that use this file.
Metadata
Table Of Contents
-
1.1 File info
-
2.2 File license