Bahaimedia
Bahaimedia
Menu
About
Contact
Help
Random Image
Recent changes
In other projects
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
File
Discussion
View history
Talk
Contributions
Create account
Log in
Navigation
About
Contact
Help
Random Image
Recent changes
In other projects
Get involved
Join the project
Media statistics
Latest Files
Upload Files
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information

File:Poured Concrete reinforces ground for Temple Stairs.jpg

Jump to:navigation, search
  • File
  • File history
  • File usage
  • Poured Concrete reinforces ground for Temple Stairs.jpg (Download file)
  • Metadata
File:Poured Concrete reinforces ground for Temple Stairs.jpg

Original file (2,400 × 2,490 pixels, file size: 1.22 MB, MIME type: image/jpeg)

File info[edit]

CaptionPoured Concrete reinforces ground for Temple Stairs.jpg Concrete is poured to reinforce the ground in preparation for construction of the stairs leading to the main entry canopy of the Temple. Lower picture shows one of nine sets of stairs.
Source Bahá’í World News Service (#1524)

File license[edit]

© Bahá’í World News Service
The copyright to this file belongs to the Bahá’í World News Service. The file is reproduced not-for-profit with permission of the Bahá'í World News Service as allowed by these terms.
Restrictions on reuse: The terms of the Bahá’í World News Service specify that: 1) this file "must at all times be attributed to the Bahá’í World News Service"; 2) the file "cannot be used in any way (including, without limitation, suggesting an association with or endorsement of any product, service, opinion or cause) that conflicts with the intent and premise of the original source"; 3) the file "may be edited for size only"; and 4) "Captions must remain with the photographs at all times".

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:21, 17 October 2025Thumbnail for version as of 18:21, 17 October 20252,400 × 2,490 (1.22 MB)Sarah (talk | contribs)== File info == {{cs | caption = Concrete is poured to reinforce the ground in preparation for construction of the stairs leading to the main entry canopy of the Temple. Lower picture shows one of nine sets of stairs. | source = {{bwn|1524}} }} ==File license== {{Baha'i World News Service}}

You cannot overwrite this file.

File usage

The following page uses this file:

  • File:Poured Concrete reinforces ground for Temple Stairs.jpg

Related media

===== [[:Category:BWNS 1524|BWNS 1524]] =====
[[File:Construction_workers_position_steel_dome_unit.jpg|520x100px]][[File:Oculus_support_frame_preassembled_at_ground_level.jpg|520x100px]]

Metadata

This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.

If the file has been modified from its original state, some details may not fully reflect the modified file.

Horizontal resolution240 dpi
Vertical resolution240 dpi
Software usedAdobe Photoshop Lightroom Classic 10.3 (Macintosh)
File change date and time08:23, 12 August 2021
Exif version2.31
Date and time of digitizing11:48, 11 August 2021
Color spacesRGB
Unique ID of original documentAA3554F6272A725DEC87A46123E9F76F
Date metadata was last modified11:23, 12 August 2021
IIM version4
Retrieved from "https://bahai.media/index.php?title=File:Poured_Concrete_reinforces_ground_for_Temple_Stairs.jpg&oldid=153147"
Category:
  • BWNS 1524
Hidden category:
  • BWNS license
This page was last edited on 17 October 2025, at 18:21.
Content is available under Creative Commons Attribution-NonCommercial-ShareAlike 3.0 License unless otherwise noted.
Privacy policy
About Bahaimedia
Disclaimers
Powered by MediaWiki