File:Construction of the Seat of the Universal House of Justice.png
Original file (1,445 × 947 pixels, file size: 1.76 MB, MIME type: image/png)
File info
[edit]| Caption | Construction of the Seat of the Universal House of Justice is proceeding on schedule. Workmen are pouring the perimeter concrete slab at ground-floor level that will support the colonnade of the building. Columns will rest in each of the sunken squares. At the center of the photograph, taken October 12, can be seen the structural pillars that will support the dome of the completed edifice. |
| Source | Bahá’í News. Issue 562, page 10. View as PDF |
File license
[edit]| From the Bahá’í Publications, by permission of the copyright owner, National Spiritual Assembly of the Bahá’ís of the United States © 1910-2021. |
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 14:59, 27 June 2026 | 1,445 × 947 (1.76 MB) | Sarah (talk | contribs) | == File info == {{cs | caption = Construction of the Seat of the Universal House of Justice is proceeding on schedule. Workmen are pouring the perimeter concrete slab at ground-floor level that will support the colonnade of the building. Columns will rest in each of the sunken squares. At the center of the photograph, taken October 12, can be seen the structural pillars that will support the dome of the completed edifice. | source = {{bns|562|10}} }} == File license == {{Bn-excerpt}} |
You cannot overwrite this file.
File usage
There are no pages that use this file.
Metadata
Table Of Contents
-
1.1 File info
-
2.2 File license