File:Berm Construction using EPS blocks Gravel.jpg
Original file (4,812 × 2,411 pixels, file size: 11.17 MB, MIME type: image/jpeg)
File info[edit]
| Caption | In preparing the berms, expanded polystyrene (EPS) blocks are first assembled and layered to create the shape of the slope. Next, gravel is poured onto the formwork, using a specialized gravel pump, to create a smooth and continuous surface. Then, a liner is laid that will separate the concrete from the gravel. A network of rebar is placed on top of the liner to strengthen the concrete, which is finally poured on top. The concrete surface is designed to allow small service vehicles to safely drive on the berm without damaging it. When completed, the berm will be covered with topsoil, and then landscaped with grass, shrubs, and other foliage. |
| Source | Bahá’í World News Service (#1625) |
File license[edit]
| © Bahá’í World News Service The copyright to this file belongs to the Bahá’í World News Service. The file is reproduced not-for-profit with permission of the Bahá'í World News Service as allowed by these terms. |
| Restrictions on reuse: The terms of the Bahá’í World News Service specify that: 1) this file "must at all times be attributed to the Bahá’í World News Service"; 2) the file "cannot be used in any way (including, without limitation, suggesting an association with or endorsement of any product, service, opinion or cause) that conflicts with the intent and premise of the original source"; 3) the file "may be edited for size only"; and 4) "Captions must remain with the photographs at all times". |
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 17:48, 18 October 2025 | 4,812 × 2,411 (11.17 MB) | Sarah (talk | contribs) | == File info == {{cs | caption = In preparing the berms, expanded polystyrene (EPS) blocks are first assembled and layered to create the shape of the slope. Next, gravel is poured onto the formwork, using a specialized gravel pump, to create a smooth and continuous surface. Then, a liner is laid that will separate the concrete from the gravel. A network of rebar is placed on top of the liner to strengthen the concrete, which is finally poured on top. The concrete surface is designed to allow... |
You cannot overwrite this file.
File usage
The following page uses this file: